Again, a full Hilton hotel fit-out for hotel refurbishment specialists Fileturn. We were asked to look at the drawings and provide costs for supplying all of the bedroom furniture as close to the designers scheme as possible. One of the main issues on this project was the variation in room types and sizes which took a lot of collaboration with designers and surveys by project managers to make this project work. As with many projects the success of the bedroom installation led to lots of additional work in public areas including numerous fire doors and glazed entrance doors.
![Contemporary Contract Furniture](https://www.wreakevalley.com/wp-content/uploads/2023/07/devonshire-club-london-library-bar-300x119.jpg)
Contemporary Contract Furniture: Elevating Modern Workspaces
Introduction to Contemporary Contract Furniture In the fast-paced world of modern business, the design and functionality of office spaces play a crucial